Assistant Director of Engineering Bryan Stilley called the failure of the structure "a little bit of an oddity." He said city workers will string up a temporary metal wire between wooden poles to hang up the traffic signals and signs until a replacement can be built.
Subscribe to continue reading this article.
Already subscribed? To login in, click here.
Originally Published: